Excavation and Grading
We grade and prep sites for driveways, parking lots and roads. We also set the drainage pipe and culverts that keep water off them.
Learn More
Driveway culvert installation comes first when a new drive crosses a roadside ditch. The pipe carries the ditch water under your drive. We put in culverts at new entrances off county roads and highways, and we replace old pipes that fail. The pipe goes in before the base and the surface.
For us, culvert work is part of the driveway job. Once the pipe is covered, the drive goes over it in crush and run, millings or hot mix. For an asphalt driveway, one company handles the pipe, the base and the paving. We work about 100 miles around Grove Hill, with a second yard in Robertsdale.
Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.
Any drive that crosses a roadside ditch needs a pipe under it. That covers a home, church or shop entrance, a second entrance, and field and timber entrances. Widening a drive takes a longer pipe.
Culvert replacement comes up when an old pipe stops carrying the water. Metal pipe rusts through, pipe gets crushed, or silt fills it in. Some pipes were too small from the start. Then water stands in the ditch, tops the drive or cuts into the road shoulder.
Rain keeps a driveway pipe busy here. NOAA's climate normals put Jackson, in Clarke County, at about 60 inches a year and Mobile at about 66. About 506 of Clarke County's 804 miles of county road are unpaved. Many drives there meet one of those roads and its ditch.
Driveway drainage starts at the ditch, so we come out and look at it first. We check which way the water runs, how much of it comes down, and what traffic the drive carries. Then you get a written quote.
Culvert installation starts with the ditch grade. The pipe goes in so its inverts, the inside bottom at each end, match the ditch. Water then runs through instead of ponding. The pipe sits on a firm bed, and the backfill around it gets packed tight, with enough cover on top.
Our motor grader shapes the entrance so it sheds water. That is the same grading and drainage work we do before any paving. Then the drive goes on top in crush and run, asphalt millings or hot mix laid with our paver.
The road owner sets the pipe size, length and material, so ask before the work starts. On a state or US highway, ALDOT's minimum driveway pipe is 15 inches, and its regions can require 18-inch pipe. ALDOT also requires sloped end sections or sloped paved headwalls. It wants at least half an inch per foot of slope from the shoulder line to the ditch line.
On roads Mobile County maintains, the county allows only reinforced concrete pipe or arch pipe in its right-of-way. Its driveway culverts run 24 or 32 feet long, plus 4:1 sloped ends. The inverts must match the ditch grade, and no right-of-way work may start before the permit is approved.
In Baldwin County, driveway permits on county-maintained roads go through the CitizenServe portal. Its agriculture driveway permit covers field and timberland entrances. In Clarke County, the County Engineer runs the Road and Bridge Department, so ask that office. We build the drive to the rules the road owner gives you.
Site visits and written quotes across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast.
(251) 589-9970From the first call to the day you can drive on it, here is how it goes.
Tell us what the driveway, lot or road is doing and where it is.
We measure the area, check how water moves across it and look at what is under the surface.
It lists the square footage, the base work, the asphalt thickness and the material.
The ground is shaped to drain, soft spots are rebuilt and the base rock is compacted.
Hot mix is laid and compacted, or sealer, paint or material goes down if that is the job. You get care instructions and a date for striping or sealing where it applies.
Common questions about driveway culverts across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast. If yours is not here, call and ask.
We grade and prep sites for driveways, parking lots and roads. We also set the drainage pipe and culverts that keep water off them.
Learn More
New asphalt driveways, gravel drives paved over and worn out drives replaced. We grade for drainage, build the base, then lay hot mix asphalt and roll it hot.
Learn More
We build and rebuild gravel and crush-and-run driveways, lots and access roads across south Alabama. We also deliver crush and run, stone and gravel by the load.
Learn MoreThe site is graded to drain, the base is compacted, and the hot mix is rolled while hot.
The company that paves your driveway or lot also patches it, fills the cracks, seals it and stripes it.
Fill dirt, topsoil, crush and run, stone and millings delivered, then spread or graded for the job at hand.
We work from the timber country down to Mobile, Baldwin County and the Gulf Coast.
Real reviews from real paving jobs, 4 reviews on Google.
Great service and great results.
Very good service. Had the church parking lot cracks sealed, recoated and new stripping added. Every one was very professional and job was completed in a timely fashion. We would recommend 3M paving.

Driveway culvert cost in Alabama: national installed ranges, culvert pipe prices per foot and 2026 ALDOT bids for 18 and 24 inch driveway pipe.
Read more →
Gravel cost in Alabama: market prices per ton, yard and dump truck load for crush and run, #57 stone and pea gravel, plus delivery and ALDOT bids.
Read more →Tell us about the driveway, lot or road, and where it is. Call or text (251) 589-9970 or send the form, and we will set a time to come look at it.
Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.