Parking Lot Striping
We stripe new parking lots and restripe faded ones for businesses, churches, schools and apartments. Stalls, arrows, fire lanes and accessible spaces go down in traffic paint on a clean surface.
Learn More
Parking blocks keep a car from pulling too far into its stall. People also call them wheel stops, parking bumpers, bumper blocks, parking stops or parking curbs. 3M Paving and Excavation sets them for businesses, churches, schools, apartments and offices. We put in bumper blocks and posts as part of a parking lot striping job or on their own.
Each set gets laid out with the stalls, so every block lines up across the row. On new parking lots, the blocks go down after the paving and striping. On older lots, we add, reset or replace them. We come out, look at the lot and give you a written quote.
Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.
A wheel stop sits at the head of a stall, where a front bumper would hang over something. That might be a storefront walk, a building, a fence, a landscaped island or a drop-off. The block stops the tire before the bumper gets there. It also marks where each space ends.
You see them at storefronts, church lots, apartment rows, clinics, offices and schools. Where a walk or a wall sits at the end of the stalls, a row of blocks keeps cars back.
In front of accessible spaces, a bumper hanging over the walk can narrow it. The 2010 ADA Standards say parked cars and vans cannot block the required clear width of an adjacent accessible route. For a walking surface, that width is 36 inches minimum.
On a new lot, the blocks go down after the asphalt and the stall striping. Each block lines up with its stall, so the row looks straight from the drive lane.
How a block gets held down depends on the block and the surface under it. One county's construction spec, for example, secures each precast concrete block with two steel pins. Each pin is at least 22 inches long. Your quote spells out the anchoring for each block.
On an existing lot, we add blocks where cars hang over a walk or an island. Broken and missing blocks get replaced, and loose or crooked ones get reset in line. Where the pavement under a block has failed, parking lot repair can come first. When the lot gets sealcoating and a restripe, the blocks get reset to the new lines.
The City of Mobile writes wheel stops into its development code. It calls for wheel stops or curbing so no part of a parked vehicle extends beyond the parking surface. That rule covers off-street lots, though spaces for single-family and two-family homes are left out. Head-in parking on asphalt also needs wheel stops or a similar way to mark the spaces.
Bigger lots in Mobile carry one more rule. A lot with more than 50 spaces and four or more rows needs pedestrian safety aisles. Each one needs a 4 foot clear path between rows, not counting bumper overhang. Wheel stops or curbing keep that path open.
Elsewhere in south Alabama, the rules come from the city or county where the lot sits. For a new commercial lot, ask the planning or zoning office before the work starts. If your lot has a site plan, the blocks go where it shows them.
Site visits and written quotes across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast.
(251) 589-9970From the first call to the day you can drive on it, here is how it goes.
Tell us what the driveway, lot or road is doing and where it is.
We measure the area, check how water moves across it and look at what is under the surface.
It lists the square footage, the base work, the asphalt thickness and the material.
The ground is shaped to drain, soft spots are rebuilt and the base rock is compacted.
Hot mix is laid and compacted, or sealer, paint or material goes down if that is the job. You get care instructions and a date for striping or sealing where it applies.
Common questions about parking blocks across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast. If yours is not here, call and ask.
We stripe new parking lots and restripe faded ones for businesses, churches, schools and apartments. Stalls, arrows, fire lanes and accessible spaces go down in traffic paint on a clean surface.
Learn More
New parking lots, replacements and resurfacing for businesses, churches, schools and clinics. Graded to drain, based and compacted, then paved in hot mix asphalt.
Learn More
Parking lot repair and maintenance for businesses, churches, schools, apartments, HOAs and towns across south Alabama. We patch potholes, fill cracks, fix standing water, sealcoat and restripe, in phases we plan with you.
Learn MoreThe site is graded to drain, the base is compacted, and the hot mix is rolled while hot.
The company that paves your driveway or lot also patches it, fills the cracks, seals it and stripes it.
Fill dirt, topsoil, crush and run, stone and millings delivered, then spread or graded for the job at hand.
We work from the timber country down to Mobile, Baldwin County and the Gulf Coast.
Real reviews from real paving jobs, 4 reviews on Google.
Great service and great results.
Very good service. Had the church parking lot cracks sealed, recoated and new stripping added. Every one was very professional and job was completed in a timely fashion. We would recommend 3M paving.
Tell us about the driveway, lot or road, and where it is. Call or text (251) 589-9970 or send the form, and we will set a time to come look at it.
Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.