Asphalt paving, sealcoating and striping across south Alabama
3M Paving and Excavation LLC
Our Services

Asphalt Driveway Paving in Grove Hill, AL

Asphalt Driveways · Grove Hill, AL

New asphalt driveways built on a base that drains

A new asphalt driveway starts with the ground under it. We grade the site so water runs off, then build and compact the base. Hot mix asphalt goes down last and gets rolled while it is hot. Rain here runs 60 to 66 inches a year, so the base and drainage decide how long a drive lasts.

We pave driveways at houses, camps, churches and farms across south Alabama. Our yard is in Grove Hill, and our second yard is in Robertsdale on the Baldwin County side. Some drives get paved over an existing gravel or crush and run drive, and others get rebuilt from bare ground. Call or text (251) 589-9970 and we will come out, look at the job and give you a written quote.

What We Handle

  • New asphalt driveways built on a graded and compacted base
  • Gravel and crush and run drives paved over with hot mix asphalt
  • Worn out asphalt driveways torn out and replaced
  • Long rural driveways through timber country and farm ground
  • Turnarounds, circular drives and extra parking pads
  • Flush tie ins at brick steps, walks and the concrete apron at the garage
  • Grading, ditches and driveway culverts so water leaves the drive
  • A written quote that lists the square footage, the base work and the asphalt thickness

Asphalt Driveways Quote

Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.

Driveway paving over gravel, or a new drive from bare ground

Clarke County maintains about 800 miles of road, and roughly 500 of those miles are still dirt or gravel. Plenty of driveways off them are gravel or crush and run too. If the drive holds its shape and the rock under it is sound, we can pave over it. A rutted drive with soft spots needs that base rebuilt first.

A driveway on bare ground is more work. We strip the topsoil and grass, cut to grade, then bring the drive up with base rock. The rock gets compacted in layers, and we shape the crown before any asphalt goes down. Turnarounds and extra parking pads get built the same way.

An old asphalt drive that is breaking up gets torn out and rebuilt. If the base under it is sound, an asphalt overlay costs less than a tear out. We tell you which one your drive is after we look at it.

How thick should an asphalt driveway be?

That depends on the ground under it and on what drives on it. The Asphalt Institute's magazine puts an ordinary home driveway at 3 inches of asphalt over an aggregate base. The other option it gives is 4 inches of asphalt laid full depth on a prepared subgrade. For that base it recommends 6 to 8 inches of compacted crushed aggregate.

Heavier traffic calls for a heavier section. A drive that only carries cars is built lighter than one that takes log trucks or a loaded farm trailer. The rock under the asphalt matters as much as the asphalt itself. Alabama highway specifications call that layer crushed aggregate base, and a crew here calls it crush and run.

Your quote spells out the thickness, the base work and the square footage for your driveway. That way you can see what the price is buying before anybody starts.

Drainage, culverts and where the driveway meets the road

Around Grove Hill the ridges run to well drained sandy loam over clay. Water soaks through the sand and stops at the clay. A drive with no fall on it stays soft underneath. Off the ridge the bottoms stay wet, and Baldwin County sits on flat sand over a high water table.

Asphalt industry guidance puts the cross slope at 2 percent or more, so water runs off instead of standing. On a long drive that means a crown down the middle and a ditch on one or both sides. Where the drive crosses a low spot or a ditch line, a pipe goes under it. We do that culvert and drainage work before the asphalt goes down.

Where a driveway ties into a public road, the road owner sets the rules. US-43 and US-84 through Grove Hill are state routes, so a turnout there needs an ALDOT permit. ALDOT counts paving an existing gravel drive as a new entrance, and its side drain pipe starts at 15 inches. A county road goes through the county engineer, and a street in town goes through the city.

Wide black asphalt driveway and parking court in front of a three car garage Long fresh asphalt driveway running through the woods to a house

Ready to get started?

Site visits and written quotes across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast.

(251) 589-9970
How We Work

How a Job With 3M Paving and Excavation Runs

From the first call to the day you can drive on it, here is how it goes.

1

Call, text or send the form

Tell us what the driveway, lot or road is doing and where it is.

2

We come look at the site

We measure the area, check how water moves across it and look at what is under the surface.

3

You get a written quote

It lists the square footage, the base work, the asphalt thickness and the material.

4

Grading and base work

The ground is shaped to drain, soft spots are rebuilt and the base rock is compacted.

5

Paving day and after

Hot mix is laid and compacted, or sealer, paint or material goes down if that is the job. You get care instructions and a date for striping or sealing where it applies.

FAQ

Asphalt Driveways Questions, Answered

Common questions about asphalt driveways across south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast. If yours is not here, call and ask.

Call (251) 589-9970

Can you pave over my gravel driveway?
Yes, in most cases. A gravel drive that still holds its shape and has sound rock under it can be paved over. We reshape the grade, add rock where it is thin, then compact it. A rutted drive with soft spots needs the base rebuilt first.
How much does an asphalt driveway cost?
The price comes down to the size of the drive, the base work it needs and the asphalt thickness. Material cost and the miles from our yard count too. We come out, look at the job and give you a written quote. Our blog covers what drives the price of an asphalt driveway in Alabama.
How long before I can drive on a new asphalt driveway?
Hot mix asphalt hardens as it cools, and asphalt association guidance says you can drive on it soon after paving. In Gulf Coast heat it cools slower. We tell you on the job when to put cars back on it. Fresh pavement scuffs if you turn the wheel while the car sits still.
When can you pave a driveway in south Alabama?
Most of the year. Alabama highway specifications stop hot mix paving below 40 degrees, and cold like that is rare here. Rain is the bigger holdup, since summer storms shut a paving crew down. We schedule around the weather and let you know when the crew is coming.
How long does an asphalt driveway last?
A state asphalt association puts a properly designed asphalt driveway at service for up to 20 years. The base under it and the drainage do most of that work. Crack filling and sealcoating on a schedule keep water out of the surface. Water in the surface is what wears a drive out early.
Can the new asphalt tie into my brick steps and garage?
Yes. We set the grade so the asphalt meets the concrete apron, the walk and the brick steps flush. That keeps the joint level for a mower, a wheelbarrow or a low car. At the road the edge gets rolled tight so it holds up under a tire.
More From 3M Paving and Excavation LLC

Work That Pairs With Asphalt Driveways

Roller compacting a fresh asphalt overlay on a curving driveway

Resurfacing and Overlays

Asphalt resurfacing lays a new layer of hot mix over pavement that is still sound underneath. We level the low spots and rebuild the failed areas before the new layer goes on.

Learn More
Freshly sealcoated asphalt driveway curving across a mowed lawn to a house

Sealcoating

Sealcoating for asphalt driveways and parking lots across south Alabama. The pavement is cleaned, the cracks are filled, and the sealer goes on while the weather holds.

Learn More
Crush and run gravel driveway running up to a detached garage

Gravel Driveways

We build and rebuild gravel and crush-and-run driveways, lots and access roads across south Alabama. We also deliver crush and run, stone and gravel by the load.

Learn More
Why Choose 3M Paving and Excavation LLC

Built for Asphalt Paving Across South Alabama

Built from the ground up

The site is graded to drain, the base is compacted, and the hot mix is rolled while hot.

Paving and upkeep in one place

The company that paves your driveway or lot also patches it, fills the cracks, seals it and stripes it.

Materials by the load

Fill dirt, topsoil, crush and run, stone and millings delivered, then spread or graded for the job at hand.

Two yards across south Alabama

We work from the timber country down to Mobile, Baldwin County and the Gulf Coast.

Guides and Resources

Asphalt Driveways Guides

Get a Quote

Get In Touch With 3M Paving and Excavation LLC

Tell us about the driveway, lot or road, and where it is. Call or text (251) 589-9970 or send the form, and we will set a time to come look at it.

  • (251) 589-9970
  • Grove Hill, AL · serving south Alabama, about 100 miles around Grove Hill, from the Black Belt to the Gulf Coast
  • Driveways, parking lots, roads, sealcoating, repair, striping and materials

Get a Quote

Tell us about the driveway, lot or road. We come out, look at the job and give you a written quote.